Concrete Mix

Use this calculator

A nominal concrete-mix ratio expresses the relative volumes of cement, sand and coarse aggregate. A dry-volume factor and waste allowance are used to estimate component quantities from a required wet-concrete volume.

Dry-material allocation by ratio

\mathrm{parts\ total}=p_{\mathrm{cement}}+p_{\mathrm{sand}}+p_{\mathrm{aggregate}}
Vd = adjusted dry-material volume (m³); Vw = Required wet concrete (m³); fd = Dry-volume factor (default 1.54); w = Waste allowance (%); Vc = cement component volume (m³); c,s,g = Cement ratio part, Sand ratio part and Aggregate ratio part. App assumes cement

Dry-material allocation by ratio

Vd = adjusted dry-material volume (m³); Vw = Required wet concrete (m³); fd = Dry-volume factor (default 1.54); w = Waste allowance (%); Vc = cement component volume (m³); c,s,g = Cement ratio part, Sand ratio part and Aggregate ratio part. App assumes cement

Dry-material allocation by ratio

Vd = adjusted dry-material volume (m³); Vw = Required wet concrete (m³); fd = Dry-volume factor (default 1.54); w = Waste allowance (%); Vc = cement component volume (m³); c,s,g = Cement ratio part, Sand ratio part and Aggregate ratio part. App assumes cement bulk density 1440 kg/m³ and 50 kg bags.

A 1:2:4 mix is divided into seven volume parts.

Vd = adjusted dry-material volume (m³); Vw = Required wet concrete (m³); fd = Dry-volume factor (default 1.54); w = Waste allowance (%); Vc = cement component volume (m³); c,s,g = Cement ratio part, Sand ratio part and Aggregate ratio part. App assumes cement bulk density 1440 kg/m³ and 50 kg bags.

Enter wet yield and volumetric recipe

ModeExact visible fields (unit; defaults where supplied)
Mix materialsRequired wet concrete (m³); Cement ratio part [default 1]; Sand ratio part [default 1.5]; Aggregate ratio part [default 3]; Dry-volume factor [default 1.54]; Waste allowance (%) [default 5]

Calculate materials from volumetric parts

Select Mix materials. Enter Required wet concrete, then Cement ratio part, Sand ratio part and Aggregate ratio part. Advanced entries include Dry-volume factor and Waste allowance. Calculate to obtain the ratio-based material order estimate.

Cement bag estimate and aggregate shares

Primary result: Cement 50 kg bags (rounded up). Details report Cement mass, Sand volume and Aggregate volume using the internal 1440 kg/m³ bulk-density assumption and ratio partitioning. For a 1:2:4 recipe the parts sum to 7.

Read the ratio as measured volume parts

A 1:2:4 ratio means one volumetric part cement, two sand and four coarse aggregate; individual allocations are fractions 1/7, 2/7 and 4/7.

Wet quantity is expanded by dry-volume factor and waste allowance.

A 1:2:4 ratio means one volumetric part cement, two sand and four coarse aggregate; individual allocations are fractions 1/7, 2/7 and 4/7.

Wet yield versus dry input volume

For 1 m³ required wet concrete at dry-volume factor 1.54 and 5% waste, the estimated dry component volume is 1.617 m³.

Cement fraction is converted to mass and rounded 50 kg bags.

For 1 m³ required wet concrete at dry-volume factor 1.54 and 5% waste, the estimated dry component volume is 1.617 m³.

Round cement bags with the actual bulk assumption

The cement share of 1.617 m³ at 1/7 is 0.231 m³. At assumed 1440 kg/m³ that is about 332.64 kg, so the guide’s 50 kg-bag illustration gives 7 bags. Structural concrete needs a verified performance-based mix design.

Quick answers

Is 1:2:4 entered as one string?

Enter the three parts separately in Cement ratio part, Sand ratio part and Aggregate ratio part.

What does the first result represent?

The rounded count of nominal 50 kg cement bags.

Can the dry-volume factor be changed?

Yes. Dry-volume factor is an advanced field with default 1.54.